+8618853850621
sales02@dearto.cn
DEARTO-Professional manufacturer of temperature and humidity calibration instruments
Home             Support              Industry Knowledge             

How to use Triple Point of Water Maintenance Bath

Apr 03.2023

How to use Triple Point of Water Maintenance Bath?

(1) Carefully put the triple point of water maintenance bath into the bottle holder, and then put the bottle holder and the bottle into the tank cylinder of the calibration bath.

(2) Click the start button in the lower right corner of the screen.

 

 How to use Triple Point of Water Maintenance Bath

(3) At this time, the temperature control program runs automatically, and when it runs for about 2 hours, the bath temperature drops to -6°C. The alarm system emits "beep", "beep two" beeps (duration about 5 minutes). The operator should press "Please take out the triple point of water maintenance bath" on the touch screen within 1 minute after hearing the beep. "Perform bottle shake" prompt interface, click the OK button, take out the bottle holder together with the triple point of water maintenance bath, and then shake the upper part of the bottle gently. At this time, the water in the bottle starts to freeze from the upper part and extends down to the The water forms the entire ice jacket (the ice jacket can rotate in the bottle at this time), and the freezing process is completed. If the OK button is not clicked within 5 minutes, the program will automatically enter the subsequent storage process.

(4) Preservation of triple point of water maintenance bath.

Observe the touch screen and wait until the bath temperature rises above -2°C. (Put the bottle holder and the triple point of water maintenance bath together into the tank of the constant temperature calibration tank. The constant temperature of the calibration tank gradually rises to 0.005°C and remains there.

(5) Insert the standard meal resistance to be tested into the preheated (cold) hole for about 5 minutes before inserting it into the bottle, and wait for 10 to 15 minutes to stabilize before reading until the calibration is over.

After the test is completed, the liquid release valve needs to be opened to exhaust the working medium before taking out the triple point of water maintenance bath.

Triple Point of Water Maintenance Bath

 

 

0   Comments
Leave a Comment
Your email address will not be published. Required fields are marked *
Submit Comment
Enter your inquiry details, We will reply you in 1 hours.
Send
Our Experts are Ready to Help You!
The real leading thermal metering and calibration instrument manufacturer
Request a Quote
We are a professional Manufacturer in China, and we are constantly innovating so that our customers can have better products and services.
© 2023 Tai'an Dearto Automation Instrument Co.,Ltd .
Privacy Policy      Terms of Service      SiteMap.html      SiteMap.xml